cost benefits

Pnu Power vs Lead/Acid performance over time
Pnu Power Compressed Air Conventional Pb
MAINTENANCE Low maintenance cost – typically one inspection per year with zero servicing High maintenance cost – need frequent inspection & servicing
SERVICE LIFE 20 year+ service life = LOW capital cost per annum c. 5-10 year service life = HIGH capital cost per annum
FAILURE Consistent reliability & availability minimise consequential costs of backup failure Risk of failure to operate can result in high consequential losses
INSTALLATION Fast installation & commissioning (c. 2hrs) reduces cost, manpower and disruption Typical 1 day installation & commissioning requires expensive & disruptive engineering
HOUSING Standard weatherproof enclosure & tolerance of harsh environments Intolerant of harsh environments: requirement for expensive climate controlled housing
MONITORING Standard display of status & run time availability is accurate, reliable and accessible online Displays of battery status and run time availability are normally a high cost option and deliver limited information
WASTE No hazardous waste disposal issues Cost implications of decommissioning & disposal